Wednesday, October 5, 2011

Build an egg mobile in less than a week... Part 2

Today I covered the floor with 3/4 decking and built the walls. Putting those walls in place was interesting! We just started covering with the siding when it was time to quit.

Hunter using his metal detector to find all the nails and screws I dropped. 
You can see the half wall covered here with CDX, the top will be covered with chicken wire for ventilation
Found another one!
Here is the side that will hold the nesting boxes
Kaelyn devised a nail holder, her own invention (my tape measure). She even filled it with a variety of nails for me :)
Here is how it looks at the end of tonight. 4 walls, a floor, and 1 wall covered with siding. 
One thing Brenda noticed when she took a peak was.. it seemed quite tall. In fat, it will barely fit out the barn door (might have to let some air out of the tires). I certainly cant put the roof on inside the barn. Fortunately the rain should be over for a few days so we can finish it outside!

No comments:

Post a Comment